DESCRIPTION PROJECT: New roasting furnace building
CONTRACTOR: Sadaci -Ghent
YEAR OF EXECUTION: 2010 /2011 + 2016
PERIOD OF EXECUTION: 8 months building + 10 working days reconstruction
AMOUNT OF WORK: 1,750,000.00 euro and 520,000 euro conversion of grate furnace building in 2016
WEIGHT OF METAL STRUCTURE: 510 T
FINISHING: painted/galvanized
BRIEF OUTLINE:
New building to replace existing roasting furnace. The final realization consisted of a re-engineering project where the entire steel structure was recalculated and outlined based on the overall design plans. The complexity of the task consisted of the height of the building combined with the limited accessibility. During the realizations of the steel structure, various technical installations were placed along with it. For safety reasons, wall cladding and the entire roof structure were pre-assembled at ground level and hoisted in as a larger whole.