DESCRIPTION PROJECT: Installation of piperacks and process equipment on the side and on top of gas tank
CONTRACTOR: Geldof / AGT oiltanking
YEAR OF EXECUTION: 2021
WEIGHT OF METAL STRUCTURE: 400 T
AMOUNT OF WORKS: 4.200.000 €
FINISHING: galva + plating + piping in subcontracting
This is about 400 tons of steel to be placed against and on top of a concrete tank at a height of +40m (tank is visible in the background of the photo).
The stair tower will be pre-assembled at ground level in 3 large pieces of +-40 tons each including complete staircases, which we will then hoist from horizontal to vertical and stack to 1 tower of 50m height. To compare , this is about the height of the OLV church in Sint-Niklaas.